PROJECT CONTROLSign in

Internal system of record

A relational project information system, not a pile of separate registers.

Scope, programme, drawings, specifications, requirements, quality records, hold points and temporary works all link to the same work breakdown, locations and lots. Missing information is shown as unable to verify — never assumed compliant.

WBS, locations and lots

One linked hierarchy with split and merge lineage kept intact.

Programme and progress

Imported baseline, native scheduling, lookahead and planned vs actual.

Design and requirements

Drawings and specifications to clause level, verified requirements with sources.

Quality and hold points

ITPs, expected records, signatures, forecast submissions and releases.